Work with Build Health International

My professional work with Build Health International, a 501(c)(3) nonprofit organization based in Beverly, Massachusetts, includes four major projects over the span of a year and a half, from July 2020 to the end of August 2021. Visit https://www.buildhealthinternational.org/projects/ for these projects and more of their work.

The Koidu Maternal Center of Excellence is a state-of-the-art maternal health complex in the Kono District of Sierra Leone, the first of its kind in the nation. On this project, I contributed to the design of the main waiting
pavilion and other outdoor spaces including a comprehensive planting design scheme, the design of the roof structures for various buildings of the complex, as well as the cataloging and preparing the layout of medical equipment and furniture.

The Hôpital Universitaire de Mirebalais, which is located in the Mirebalais Arrondissement of Haiti’s Centre Department and opened in 2013, is the largest public hospital in Haiti. In 2021, a small BHI team designed a new diagnostic center addition for the complex equipped with an x-ray and CT scanning space. I was one of three on the architecture team, and contributed to the design of the facades, roof structure, building and equipment layout, and connection to existing structure; as well as research and detail work pertaining to the radiation-shielding of the screening spaces.

Wesleyan Hospital is a large teaching hospital owned by the Wesleyan Methodist Church, near the city Anse-à-Galets on the Haitian island of La Gonâve. BHI is developing a master plan for the hospital, which had been struggling due to inadequate infrastructure, lack of medicinal resources and facilities, and the COVID-19 pandemic. I contributed to the master planning report, including creating site analysis and preliminary development strategy diagrams, writing text, and formatting the report.

St. Rock Hospital is an addition to an existing clinic in Carrefour, a suburb of Port-au-Prince, Haiti’s capital. The existing clinic has inadequate space and resources to treat Carrefour’s population of over 500,000, a critical need that this new development will address. It is expected to increase the facility’s capacity by over 400% and provide new facilities for much needed types of care including HIV, dentistry, and mental health.

Renderings and photos of the Maternal Center of Excellence. Via Build Health International and Partners in Health Sierra Leone. See https://www.buildhealthinternational.org/project/maternal-center-of-excellence/ and https://www.pihsierraleone.com/mcoe for more information.

Planting plan of Maternal Center of Excellence campus.